For commissioning and qualification teams

A test sheet owed on every tagged item. Generated, not typed.

You have hundreds or thousands of tagged items and a test sheet owed on every one. Rowsys generates the full set from your asset list: the right inspection and test documents for each equipment type, pre-filled with tags, locations and design data, and numbered in the order the work must happen.

54 seconds · sound off

Paste your equipment list and it becomes the asset register. One rule per asset type generates every test sheet. Technicians complete them on a tablet at the equipment, out-of-limit readings flag themselves, and serial numbers are saved to the asset. Handover is signed, versioned PDF records.

0:00 0:54

The problem

Where the hours go on a commissioning project

Four places a commissioning team loses time. None of it is engineering. Each card shows what Rowsys does about it.

An engineer in a hi-vis vest types results from paper test sheets into a laptop late at night, the clock near eleven After hours

Paperwork that takes longer than the job

Evenings spent preparing test sheets and typing results into spreadsheets, by the people you are paying to be on the equipment.

With Rowsys: every test sheet is generated from the asset list, pre-filled with tag, location and design data.

A motor nameplate, a paper inspection form, a spreadsheet and a phone app, each holding the same serial number Typed three times

Data entered two or three times

The serial number goes on the form, then the spreadsheet, then the maintenance system. Each copy is a chance to get it wrong.

With Rowsys: the technician records it once, at the equipment, and the asset register is updated.

A marked-up revision of a test procedure laid beside a tall pile of signed copies of the old version Which version?

Templates that change mid-project

The client revises a test. Nobody is sure which documents are affected, or what should happen to the ones already signed.

With Rowsys: every document knows its template version. You choose what happens to work in progress, and signed records are kept.

A pallet of archive boxes and binders in a finished plant room, a client representative leafing through one binder Days to prove it

Handover as a box of paper

The work was done, but showing who did it, when and to which version of the procedure takes days.

With Rowsys: each record is a signed PDF with a cover page, revision history and sign-off record printed in it.

One register, four problems gone. See how it works.

From equipment list to handover

With Rowsys

From equipment list to signed handover

Three stages, seven flows. Pick one to see where the information goes.

Set up

On site

Handover

In the officeRegister

Paste the equipment list as an indented outline and Rowsys turns it into a tree in one step.

  1. Register (in the office): Paste the equipment list as an indented outline and Rowsys turns it into a tree in one step.
  2. Generate (office to site): A rule says every asset of this type gets this template. One run creates every required document.
  3. Sequence (office to site): Installation checks before energisation, energisation before functional tests. Staff see what is ready.
  4. Serial numbers (site to office): The technician records the installed serial number during the inspection and the register is updated.
  5. Deviations (site to office): When a step fails, a deviation is raised on the document and the exact step, pre-filled and linked.
  6. Client change (office to site): Publish a new template version and choose what happens to work in progress. Completed documents can stay as signed.
  7. Records (site to office): Each finished document is a PDF with a cover page, a revision history and a sign-off record printed in it.
The register by lunchtime
Paste the equipment list as an indented outline and Rowsys turns it into a tree in one step. Each line is matched to an asset type, so every asset arrives with its specification sheet ready to fill. Save a pump set once as an assembly and drop it in wherever it occurs. Or give an AI assistant the P&ID: it proposes the outline, matches each item to your asset types and lists anything it could not read with confidence.
The whole project’s paperwork in one run
A rule says every asset of this type gets this template. Preview the run, then create every required document across the project. Run it again after adding assets and only the missing documents are created, never duplicates. A project overview shows asset types against templates, so gaps in coverage are obvious.
The right work in the right order
Group documents into a sequence: installation checks before energisation, energisation before functional tests. Staff see what is ready and what is waiting. Starting something early shows a warning. Build a sequence for one system and copy it to every other system of the same type.
Completed at the equipment
Technicians open the document for the asset in front of them, on a phone or tablet, with its details already filled in. They record readings, mark steps pass, fail or not applicable, take photographs and sign on screen. A reading outside its limit is flagged in red on screen and in the PDF.
A failed step becomes a deviation on the spot
When a step fails, Rowsys asks what it needs: a task, an issue or a deviation raised on the document and the exact step. The follow-up is pre-filled with the asset, the step, the answer and the location, and stays linked to the document.
Captured once
The technician records the installed serial number during the inspection and the register is updated. A nameplate check fills in manufacturer, model and rating. Every inspection leaves the register more complete than it found it.
Version control that respects work already done
Every document remembers the template version it was created on. Publish a new version and Rowsys shows how many documents are untouched, in progress or complete. You choose what happens: leave everything, move the not-started documents, supersede the in-progress ones or require completed ones to be re-executed. A superseded document is kept, marked and linked to its replacement with the reason.
Records fit to hand to a client
Each finished document is a PDF with a cover page, contents, a revision history and a sign-off record printed in it. Certificates and datasheets are pulled in from the asset’s files as appendices. Watermarks follow status: DRAFT until complete, SUPERSEDED once replaced. An archive format (PDF/A) is available for long-term retention.

If commissioning is your business

Your method, reused on every project

A services firm is only as consistent as its templates. Rowsys keeps yours in one place and applies them the same way on every project and in every office.

A catalogue you own

Import asset types from the Rowsys library, then own and extend your catalogue. Attributes and units are controlled, so data stays consistent and comparable across projects.

Templates built once

Cover pages, headers and footers are designed once and shared across templates. A standard section is embedded wherever it is needed and maintained in one place.

Your name on every page

Your logo and branding appear on every page of every record you hand over.

Your client’s words and stages

One operation calls them inspections, another test packs. The terms on screen follow the operation, and documents move through the stages you define per project, such as draft, started, executed, reviewed and approved.

A worked example, not a customer case study

Commissioning a packing line

600 tagged assets, from the equipment list to signed handover, in six steps.

  1. Step 01

    Load the equipment list

    Paste it as an outline. By lunchtime, 600 assets are in the register, each with its specification sheet.

  2. Step 02

    Generate the documents

    Rules create the inspection and test documents for every asset type.

  3. Step 03

    Put them in order

    For each system: installation check, then energisation, then functional test.

  4. Step 04

    Test at the equipment

    Technicians work on tablets, with rated current already filled in. A reading out of range flags red and raises a deviation.

  5. Midway, the client changes a test

    Absorb the change

    Publish a new template version. Not-started documents move to it. Completed ones stay as signed.

  6. Step 06

    Hand over

    Every system has signed PDFs with revision history. The register holds every serial number captured along the way.

Outcomes

What you get

  • Document sets generated from the asset list, not prepared by hand
  • Readings, results and serial numbers captured once, on site
  • Template changes handled without disturbing signed records
  • Every system handed over as signed PDFs with revision history
  • Engineers and technicians on the equipment, not formatting documents

Direct answers

Common questions

Can we use our own test sheet formats?

Yes. A template is a properly formatted document with live asset data merged in and interactive sections people fill in on site: questions, pass and fail buttons, photos, signatures and editable test tables with typed columns, units and limits. A live preview shows the template on a real asset as you build it, on screen and as a PDF.

What happens when the client changes a test mid-project?

You publish a new template version and Rowsys shows the impact: how many documents are untouched, in progress or complete. You decide what happens to each group. Completed records always display and print the version they were signed on.

Does Rowsys stop someone starting a test out of sequence?

No. Starting something early shows a warning. Rowsys advises. It never blocks the person on site.

How does it handle a switchboard with forty breakers?

A section, a table row or a whole embedded template can repeat for every asset beneath the document’s asset. A switchboard test sheet lists every circuit breaker inside that board, one row each, with its own rating. One template produces the right document for a single valve or an entire building.

What do we need to get started?

An equipment list. Paste it as an outline and each line is matched to an asset type from your catalogue and the Rowsys library, so you do not start from a blank page.

See the method in practice

Bring an equipment list from a past project.

The walkthrough runs on your own equipment and your own test sheets, from the register to a signed PDF.